The shop does not release a quench without a temper: straight from the bath a part is brittle and stressed, and tempering relieves it and brings the hardness down to working level. It is one operation pair, so it is written up together.

7509001050 °CU858–62 HRC65G55–60 HRC4545–50 HRC40KhN48–53 HRCShKh1561–65 HRC40Kh48–52 HRC9KhS60–63 HRCKh12MF58–62 HRC
Austenitising bands and the hardness they give as-quenched. The tool grade Kh12MF stands apart, heated past a thousand degrees.

Austenitising

Heating is done in the КЭП-1 and КЭП-2 chamber furnaces, two thermocouples each, held to ±10 °C. Tool grades go in with a preheat so nothing cracks on the way up; 9KhS and Kh12MF get a two-stage preheat, and Kh12MF sits at 850 °C before it goes on to the working temperature.

GradeAustenitising, °CQuenchantHardness
45820–840polymer–water45–50 HRC
40Kh840–860oil I-20A48–52 HRC
40KhN820–840oil I-20A48–53 HRC
65G810–830oil I-20A55–60 HRC
U8780–800water58–62 HRC
9KhS840–860oil I-20A60–63 HRC
ShKh15830–850oil I-20A61–65 HRC
Kh12MF1020–1040oil or air58–62 HRC

Quenchants

Oil I-20A is held at 40–60 °C and stirred - cold oil pulls heat too fast and cracks parts. For distortion-prone 45 we use an 8–12 % polymer–water bath and check the concentration with a refractometer once a shift. Water is kept only for carbon U8 in a heavy section.

Tempering

Tempering is set no later than four hours after the quench, or tool grades pick up cracks from sitting hardened. We step around the 250–400 °C window, where many structural steels lose impact toughness to temper embrittlement.

Three tempering bands
BandTemperature, °CTimeResult
low150–2501.5–2 hstress relief, hardness down by 1–3 HRC
medium350–4501.5–2.5 hspringiness, 42–48 HRC on spring grades
high550–6502–3 himprovement, a tough core at 28–34 HRC

Base tempering time grows with the section: we add an hour for every 25 mm. The high temper runs in the dedicated ПО-1 furnace held to ±5 °C, because here a steady temperature matters more than a high ceiling.

Quench-and-temper takes 2–4 working days, depending on furnace load and batch size. Related: allowances and prep, how we measure hardness, why distortion happens.